Sunday 21 March 2021

First New Frames!

Following a little delay in the timber delivery, Juanpa drove and picked up the Iroko strips, that had been prepared for laminating the new hull frames. Epoxy was bought and we got on with laminating the first new frames to go into the boat by us. We are removing a few frames at a time. Replacing them and then moving on to the next ones. Three are now in, with about another seven to be replaced. Whereas the previous owner had tried repairing the top sections of the frames and scarfing the new onto the old, we are replacing the whole frame from sheer to keel.